Distributed electricity generation through an 80 kW grid-connected photovoltaic system.
Industria Metal - Ce
Distributed electricity generation through an 80 kW grid-connected photovoltaic system.
City of Cordoba
Replacement of conductors and remodeling of medium-voltage (13.2 kV) distribution networks in the neighborhoods of Juniors, Renacimiento, and Altamira.
City of Cordoba
Replacement of conductors and remodeling of medium-voltage (13.2 kV) distribution networks in the neighborhoods of Juniors, Renacimiento, and Altamira.
Mina Clavero
Survey and adaptation of metering points to mitigate electrical risks.
Mina Clavero
Survey and adaptation of metering points to mitigate electrical risks.
Caminos de las Sierras
Installation of lighting at the Av. Circunvalación – Camino San Antonio interchange.
Caminos de las Sierras
Installation of lighting at the Av. Circunvalación – Camino San Antonio interchange.